Thames Flood Alleviation - Desborough Channel safe

11 Oct 2019

 On Wednesday 2nd October, Weybridge Riverside ward councillors met with representatives from the Environment Agency and their consultants in the team tasked with River Thames Flood Alleviation Scheme.

This work has been ongoing for several years now, with serious hydraulic modelling of flows in the Thames around Weybridge. The outcome of the most recent work are positive for Weybridge residents. It appears the flood risk for Weybridge can be reduced without any modification to the banks of the Desborough Channel - the stretch of water that separates Desborough Island from the eastern bank of the Thames alongside Walton Lane.

There is now no threat to the towpath and no need to cut back the bank on Desborough Island, with the consequent loss of trees.  Instead, it is proposed the river bed will be lowered further downstream.

This website uses cookies

Like most websites, this site uses cookies. Some are required to make it work, while others are used for statistical or marketing purposes. If you choose not to allow cookies some features may not be available, such as content from other websites. Please read our Cookie Policy for more information.

Essential cookies enable basic functions and are necessary for the website to function properly.
Statistics cookies collect information anonymously. This information helps us to understand how our visitors use our website.
Marketing cookies are used by third parties or publishers to display personalized advertisements. They do this by tracking visitors across websites.